This video from oorail.com is a short Layout Update for Sunday December 23rd 2012. The video focuses on the addition of a new line that will run from a central terminus station over an elevated track and into the upcoming layout extension. This new line will be the first to be electrified with Overhead Line Equipment (OHLE/OLE) in the near future. The video demonstrates how to create isolated track sections using insulated (insulfrog) points and clever placement of the power connection in DC…